2014-5 Multiphase Engineering, Silviculture and Timber Development.
The AVCFC is looking for a qualified contractor to do multiphase engineering, silviculture and timber development of 30000 m3 in the Sproat FDU
there are 15 PDF attachments for this contract tender.
Update:
February 5th, 2015 Awarded to K2 Forestry Services Ltd.
Attachment | Size |
---|---|
1. Info and Tender | 298.43 KB |
2. Sample Contract | 228.74 KB |
3. Schedule A Multiphase Engineering | 363.19 KB |
4. Schedule B 2014-5 Payment | 190.5 KB |
5. Schedule C 2014-5 Subcontracting | 172.84 KB |
6. Schedule D 2014-5 Insurance | 103.38 KB |
7. Schedule E 2014-5 Digital Use | 100.15 KB |
8. Schedule F 2014-5 Safety | 176.8 KB |
9. Schedule G 2014-5 Prime Contractor | 195.6 KB |
10. Schedule H 2014-5 Safe Certificate | 94.2 KB |
11. Appendix 1 2014-5 Checklist | 106.86 KB |
12. Appendix 2 Digital File Map and GIS Standards | 100.78 KB |
13. Appendix 3 2014-5 Stream | 2.5 MB |
14. Appendix 4 2014-5 Links for Maps and Documents | 102.68 KB |
15. Amendments Questions and Answers | 29.45 KB |