2016-4 RFP - CP 9 and 10. Blocks 1, 2 and TS2. Harvest of Standing Timber and Road Building
Update:
Awarded to Probyn Log Ltd.
Attachment | Size |
---|---|
RFP - Standing Timber 2016-4 CP 9 and 10 (updated) | 4.13 MB |
CP 9 Block TS2 Engineer Report | 15.6 MB |
CP 10 Blocks 1 and 2 Engineers Report | 14.11 MB |